Construction project management, built for Saudi sites

Who's sitting on your request?
And since when?

PEXA shows who holds every request and payment certificate, for how many days — and reminds them until it moves. From site to certificate, in one record shared by contractor, consultant and owner.

A PEXA inspection request page: with Eng. Sara Al-Qahtani since 17 Nov, 7 days late, with the approval chain and the step history
  • #1

    cause of late certificate payment

    Slow decisions and approvals, according to 110 professionals on Saudi projects.

    Peer-reviewed study, 2024

  • 10

    years

    How long a claim can come back to your project. Your record has to outlive the job.

    Civil Transactions Law, Art. 295

  • Top 5

    causes of delay

    Slow drawing review and approval — owners, consultants and contractors all agree.

    Study of Saudi projects

Projects don't stall on site. They stall on someone's desk.

  • You chase approvals by phone.

    A call, then a message, then a visit. The request is still waiting — and nobody knows with whom, or since when.

  • A verbal instruction. Then a denial.

    "I never said that." Without a written record it is your word against theirs, and the contractor pays.

  • The certificate, rebuilt every month.

    Excel sheets, previous figures added by hand, a week lost before it reaches the consultant. Then it waits for payment.

  • The latest drawing, lost in the group chat.

    A hundred WhatsApp messages, undated photos, work built off an old revision. The decision is buried under all of it.

Keep WhatsApp for talk.
Keep the record in PEXA.

Where is the request?

One inspection request, twice: once the way it happens today, once on PEXA.

The PEXA film · in Arabic

From site to payment certificate, in three steps.

Entered once. Followed up by itself. Kept on record.

  1. 1Raised on site
  2. 2Approved from wherever you are
  3. 3Becomes progress, and a certificate

1Raised on site

The office in your pocket. Even when the signal drops.

The engineer opens the phone, takes the photo, pins it on the drawing and sends. What is done offline is kept and sent when the signal returns.

  • Site photos straight into the request.
  • Remarks on the drawing with your finger.
  • "Needs me": only what is waiting on you.
The PEXA phone app's "Needs me" list: requests waiting on the engineer, two of them overdue
Raising an inspection request from the phone in PEXA: a site photo, the work description and the reply due date
Markup on a drawing in the PEXA phone app

2Approved from wherever you are

Every request has an owner and a due date. And a reminder until it is done.

It reaches the person who holds it, by name, with its attachments and its due date. Approve, or return it with a written reason. Everyone sees.

An approved inspection request in PEXA: the request details, the site photos, the consultant's review code B and the exchange between the engineer and the consultant
  • The name of who holds it now, and for how many days.
  • A due date in working days, with a nudge before and after it.
  • The consultant's decision, with its code and remark, on the request itself.
  • Nothing comes back without a written reason.

3Becomes progress, and a certificate

The certificate builds itself from approved work. Not from re-adding the numbers.

Import the BOQ from Excel once. Every month: this period, previous and net due, calculated. The consultant reviews line by line and signs; the owner approves and records the payments.

  • Net due calculated: cumulative minus previous.
  • Every line shows the approved inspections behind it.
  • Signed and approved inside PEXA, fingerprinted to the version signed.
  • Payments tracked to the last riyal, with the balance in plain sight.
The certificate printed from PEXA in Arabic and English: the BOQ lines with their cumulative, previous and this-period values
A PEXA certificate's figures: cumulative work value, less previously certified, and SAR 990,700.00 net due

Know who's late, on what, and where. At a glance.

Instead of compiling Thursday's report: one board showing late work by party, type and floor, and the oldest open item with each side.

Who?

Open items by holder: within the period, late, and very late.

The PEXA follow-up board: open items held by the contractor, the consultant and the owner, by lateness

What?

By status, type and discipline: where the open work sits.

The PEXA follow-up board: requests by status, type and discipline

Where?

A heat map by floor: where late work piles up.

The PEXA follow-up board: a heat map of open and overdue requests by floor

Everything on the project, in the same place.

  • Non-conformance reports

    From the finding to the corrective action to the close-out, with photos.

  • Test results

    Recorded on the inspection request, and locked once recorded.

  • Procurement

    Material requests, quotations, purchase orders and deliveries. Supplier prices stay hidden from the consultant and the owner.

  • Site stores

    Issues, returns and transfers, with a bin card for every item.

  • Weekly report

    Built from the project record on its own, signed by the PM.

  • Bill of quantities

    Imported from Excel in minutes, the base of every certificate.

One record. Each party sees what is theirs.

Project manager

See the whole project — and who's holding it up.

  • Who holds every request and certificate
  • Delay by party and location
  • A weekly report ready to sign

You stopCompiling reports and chasing replies.

Site engineer

Raise and follow up from your phone.

  • A request from site in a minute
  • Photos and markup on the drawing
  • An alert when it is approved or returned

You stopCalling to ask "where is my request?".

Consultant

The request reaches you complete, by name.

  • Attachments and drawing in one place
  • Sign several items in one go
  • Review the certificate line by line

You stopDigging through e-mail and chat groups for attachments.

Owner

Know where your money and your project stand.

  • What is done and what awaits you
  • Every amount traced to the work
  • Payments and balance on one page

You stopWaiting for a report that says nothing.

When a dispute comes, the record speaks.

A claim can come back years later. What PEXA keeps today is what you put on the table that day.

Nothing is deleted
Documents and requests are archived, never erased. A cancelled version stays, stamped as cancelled.
A fingerprint on every round sent
Each round carries its own fingerprint, and a sign-off is tied to the version that was signed.
Receipt is recorded
The moment the receiving party opens a request is logged, once. No more "it never reached me".
A test result cannot be edited
A correction is a new line. The original stays as recorded.
Every file is scanned
No file opens before its virus scan, and each upload is checked for integrity.
Ten years at least
The record is kept after the project is archived, and exports to Excel and PDF whenever you need it.

Everything that could delay the start, we've solved.

  • Live in days

    We set up your first project with you: the team, the request types and the BOQ from your own file.

  • Your consultant doesn't have to switch

    If they reply on paper, the contractor records the reply with its code, date and a scan of the letter. The record stays complete.

  • In your team's language

    Arabic, English and Urdu, from site to office. And the certificate prints in proper Arabic.

  • Your data leaves with you

    Export the registers to Excel and PDF at any time. Nothing is locked inside.

  • Your prices stay yours

    Procurement and stores are the contractor's alone. The consultant and the owner never see your supplier prices.

  • Any phone, any signal

    Works in the browser and on the phone, and keeps your work when you are offline.

Request a demo

on WhatsApp · we reply within working hours

One price per project. Everyone's in.

  • One price per project, every feature, no seat counting.
  • The consultant and the owner join free.
  • The price never rises on a running project.

Before you ask.

How long does it take to get PEXA running on my project?

Days. We set up the team and request types with you, import your BOQ from Excel, and your team works from day one.

What if the consultant refuses to use it?

Nothing stops. The contractor records the consultant's paper reply with its code, reference, date and a scan of the letter, so the record stays complete. When the consultant joins, they work from the same request.

Do the consultant and the owner pay?

No. One party pays one price per project; the consultant and the owner join free.

Does it work without internet?

Yes. Requests and photos are kept on the phone and sent as soon as the signal returns.

Can the consultant or the owner see procurement prices?

No. Purchase orders, stores and supplier prices sit behind the contractor's wall and are never shown to another party.

What happens to the project data when the job ends?

Nothing is deleted. The record is kept at least ten years after the project is archived, and you can export the registers to Excel and PDF at any time.

Does my team need long training?

No. Everyone sees only what is waiting on them, in Arabic, English or Urdu. We start with a short session per role.

End the chasing.
Start with your first project.

We show you PEXA on a project like yours: a request from site, an approval, then a certificate. In thirty minutes.

One WhatsApp message is enough to start.

Request a demo on WhatsApp